*Kazakhstan/Pavlodar, Entire Operation of 2008-2009

Main Contractor : Unit Group 

  • Factory of gasification coal. (JSC, A.O.K)
  • Rest House. Zarinsky District (JSC, A.O.K)
  • Plant on production of primary aluminum. (Kazakhstan Electrolysis Plant)
  • A Mechanical elevator with a capacity of up to 16.000 m3/h   
  • Rerouting of a 4.4 km stretch of the Zhezkazgan-Petropavlovsk, Route A-16
  • Insallation of central desk, HVAC at SDPP-1 station, Ekibastuz
  • Construction of an approach railroad to the electrolysis plant with a branch line to the Yuzhny Station.
  • Railroad, CGS Dumping Machine No.3
  • Loading of off-loading railway tracks at Vostochnaya Station.

 

*(Projects which founders of HICC have been involved.)