Projects

Poti Methanol Terminal Project - POTI/GEORGIA

Project Information

Engineering, Procurement and Construction of Methanol Terminal and Jetty including storage tanks, rail cars unloading system, vessels loading system.

Project Manhour: 1,000,000 Hours
78.000 DIA Inch Piping Works
95 km Cable Pulling
10,000 m3 Storage Tank             
20,000 m3 Storage Tank
2,100 Ton Steel Erection
16,000 m3 Concrete Works
480 Workers / 100 Turkish – 380 Local Workers

Poti Project Personnel Camp 


Van Oord - Primorsk Port - BAKU / AZERBAIJAN

Project Information

Dredging Piping & Mechanical Erection Works

 

NOBEL OIL COMPANY Guneshli DDO-4 Oil & Gas Platform BAKU / AZERBAIJAN

Project information

Maintenance, Cleaning, Testing, Pre-commissioning
Modification and Rectification Works of various
Gas Compressors
Installation of pipe lines
Welding works
NDT application cleaning and hydro-test works of pipe lines on platform
Steel erection works
All works were completed by our own manpower (offshore certificated) and equipment

   


 

AIRPORT NEW COMPLEX CONSTRUCTION – BAKU/AZERBAIJAN

Project Information

Baku International Airport’s new terminal construction
Steel erection Works

--- Completed ---

   

   

Global Stroy Engineering - PVC Plant - Nijninovgorod / RUSSIA

Project Information

Equipment Erection
Piping Erection
Steel Structure
QA/QC & NDT Services
Project Management Services

   Global Stroy Engineering - PVC Plant – Nijninovgorod RUSSIA

 

Due Diligence Study Of Baku 50 Mw Wind Energy Farm, Azerbaijan

Due Diligence Study Of Baku 50 Mw Wind Energy Farm, Azerbaijan

Basic Design Works Of Vlore Terminal Renovation Project, Albania

Basic Design Works Of Vlore Terminal Renovation Project, Albania

 

Feasibility And Due Diligence Study Of Baku Accumulator Factory, Azerbaijan

Feasibility And Due Diligence Study Of Baku Accumulator Factory, Azerbaijan

CO2 PLANT AZERBAIJAN

Project information

The CO2 Plant project in Azarbaijan for German Company, EPC has started on 1st February 2014 and it is planned to be finsihed by the end of November 2014.

Piping 35.000 dia inch
Cable pulling 10 km
Steel structre 110 tons
Civil concrete Works 20.000 m3


                         

COOLING TOWERS AZERBAIJAN

Project information

The Cooling Tower in AZMECO Plant has started on 1st April 2014 and planned to be finished in November 2014..

Piping 18.000 dia inch
Electrical Works 4.5 km
Pumps installation 4pcs
Fans installation 4 pcs
Civil concrete Works 120.000 m3
Prefabrication and installation of 1 complete set of tower package.


                             

SOCAR Black Sea Terminal

Project information

SOCAR Black Sea Terminal, Kulevi, Georgia project has started in February 2014 and planned to be finished by November 2014.

Methanol Pipeline 20” ASTM A 106 GR B – 950 Meters
Methanol Pipeline 16” ASTM A 106 GR B – 100 Meters
Nitrogen Pipeline 6” ASTM A 106 GR B – 1650 Meters
RTC Unloading Collector Pipeline DN 400 GOST-R – 500 Meters
Temporary Pump Station
New Pump Station Steel Works – 30 Tons
RTC Unloading Arm Revisions – 42 Pcs
Storage Tank Cleaning
Electrical & Instrumentation Works


                                                 

HICC Welding School

Welding School located in BAKU site, aims to  train competent welders.

Azmeco Methanol Plant - AZERBAIJAN

Project information

Site Engineering & Inspection
Equipment Repair & Erection
Electrical Works
Instrumentation Works
Piping Erection
Insulation
QA/QC & Inspections (Equip,Steel, E&I,Paint & Insl.)