Projects

*Natural Gas Pipeline Project -UKRAINE

Project information

Piping          :80 KM 48 dia”

        

*(Projects which founders of HICC have been involved.)

*Onshore Gas Terminal Tankage- TURKMENISTAN

Project information

Weight              :2500 MT
Total man-hour       :800.000






*(Projects which founders of HICC have been involved.)

*MSCC unit Turkmenbashi Refinery - TURKMENISTAN

Project information

Piping         :1,900 MT
Steel works       :3,800 MT
Equipment   :3,550 MT
E/I              :63 km
Civil works    :13,000 m3
Man-hour     :1,600,000 


        

*(Projects which founders of HICC have been involved.)

*MDP-A Drilling Platform- TURKMENISTAN

Project information

Steel Works           :1200 MT
Painting & Blasting        :12.000 m2
Total man-hour      :1.000.000
Height                   :78 mt


       

*(Projects which founders of HICC have been involved.)

*MCR-A Topside & GBS - TURKMENISTAN

Project information

E/I works cabling                 :165,000 mt 
Topside weight                    :5,777 tons
GBS weight                          :8,030 tons
Total weight of equipments       :875 tons 
Scaffolding erected               :24,000 m3
Painting and blasting            :36,000 m2
Piping installation                 :51,000 dia-inch (800 tons)
Insulation                            :6,500 m2


            

*(Projects which founders of HICC have been involved.)

*Lube-oil unit Turkmenbashi Refinery - TURKMENISTAN

Project information

Piping           :3,000 MT
Steel works         :14,950 MT
Equipment     :1,380 MT
E/I                :30 km
Civil works      :17,250 m3
Man-hour       :2,070,000 


*(Projects which founders of HICC have been involved.)

*Sugözü Coal Fired Thermal Power Plant 2x 605 MW - TURKEY

Project information

Piping         :3,500 MT
Steel works       :26,500 MT
Equipment   :8,800 MT
E/I             
:585 km
Civil wokrs   :205,000 m3
Man-hour     :7,350,000


      

*(Projects which founders of HICC have been involved.)

*Tynagh Combined Cycle Power Plant 400 MW - IRELAND

Project information

Piping          :1,500 MT
Steel works       :2,500 MT
Equipment    :3,800 MT
E/I               :185 km
Civil wokrs     :25,000 m3
Man-hour      :1,350,000



      

*(Projects which founders of HICC have been involved.)

*HDT unit Turkmenbashi Refinery - TURKMENISTAN

Project information

Piping         :1,520 MT
Steel works        :3,040 MT
Equipment   :1,120 MT
E/I              :195 km
Civil works    :10,400 m3
Man-hour     :1,280,000 

 
*(Projects which founders of HICC have been involved.)

*Bukhara Refinery - UZBEKISTAN

Project Information

Piping            :2,750 MT 
Steel works    :3,040 MT
Equipment :2,800 MT
E/I :528 KM
Civil works :26,600 m3
Man-hour :6,280,000

 


 

 



*(Projects which founders of HICC have been involved.)

*CCR unit Turkmenbashi Refinery - TURKMENISTAN

Project information

Piping :2,000 MT
Steel works     :4,000 MT
Equipment :1,200 MT
E/I  :80 km
Civil works :15,000 m3
Man-hour :1,800,000


*(Projects which founders of HICC have been involved.)

Azersu - AZERBAIJAN

Project information

         

*Kazakhstan/Pavlodar, Entire Operation of 2008-2009

Main Contractor : Unit Group 

  • Factory of gasification coal. (JSC, A.O.K)
  • Rest House. Zarinsky District (JSC, A.O.K)
  • Plant on production of primary aluminum. (Kazakhstan Electrolysis Plant)
  • A Mechanical elevator with a capacity of up to 16.000 m3/h   
  • Rerouting of a 4.4 km stretch of the Zhezkazgan-Petropavlovsk, Route A-16
  • Insallation of central desk, HVAC at SDPP-1 station, Ekibastuz
  • Construction of an approach railroad to the electrolysis plant with a branch line to the Yuzhny Station.
  • Railroad, CGS Dumping Machine No.3
  • Loading of off-loading railway tracks at Vostochnaya Station.

 

*(Projects which founders of HICC have been involved.)

 

*Pavlodar, Rakhmet Mall

Project information

Main Contractor : Unit Group 
Customer          : Sharzen LLP
Project Duration : 12 Months (2008 - 2009)

  •  4900 m2 total area.



*(Projects which founders of HICC have been involved.)

Pavlodar, Nursery School

Project information

Main Contractor : Unit Group 
Customer          : Kazakhstan Aluminum JSC
Project Duration : 12 Months ( November 2008 - December 2009)

  •  240 people capacity, 


*(Projects which founders of HICC have been involved.)

* Pavlodar, Four Blocks of Flats

Project information

Main Contractor : Unit Group 
Customer          : Kazakhstan Aluminum JSC
Project Duration : 18 Months ( February 2008 - September 2009)


*(Projects which founders of HICC have been involved.)

TPP 1, Pavlodar Cooling Tower (No.3)

Project information

Main Contractor : Unit Group 
Customer          : Kazakhstan Aluminum JSC
Project Duration : 19 Months ( February 2008 - September 2009)


*(Projects which founders of HICC have been involved.)

*Sakhalin LNG

Project information

Piping         :3,600 MT
Steel works       :5,800 MT






*(Projects which founders of HICC have been involved.)

*Pavlodar CS Funnel (No 4), 120 Meters.

Project information

Main Contractor : Unit Group 
Customer          : Kazakhstan Aluminum JSC
Project Duration : 19 Months ( February 2008 - September 2009)


*(Projects which founders of HICC have been involved.)

Hadeed II Induction Plant Project – Kingdom of Saudi Arabia

General Project’s Data

1.240.000 ton/year capacity Direct Reduction Induction Plant mechanical works Installation, partial material supply and instrumentation works.


Customer Saudi Davy Company Ltd.


Scope of the Works
a. Mechanical Erection Works;


  4.400 tons of structural steel fabrication and erection works
  800 tons piping prefabrications and installation works (103.000 WDI)
  8000 ton pressurized vessel fabrication and installation works
  in addition to 440 tons of Reactor installations, heavy equipments installation works
  20.000 m2 surface blasting and painting works
  17.000 m2 roof and side wall cladding works
  

b. Instrumentation works;;

  4.000 nos instruments
  7000 m instrument cables

c. assistance to start up and commissioning activities.



 

Baku- Tibilisi - Ceyhan Crude Oil Pipeline Project-Turkey

General Project’s Data

Total Project value: 1,7 Billion USD
Total Length of Pipeline: 1.075.366 m.
Pipe Diameters: 46” – 42” - 34”
Total Pump Stations: 6 pieces (4 pieces Main Pump Stations, 2 pieces of Pig Stations)
Block Valve Stations: 51 pieces
Total excavation: 15.580.540 m3
Total backfilling: 8.313.622 m3
Total concrete: 112.000 m3
Total workmanship: 12.074 kişi