Projects
*Natural Gas Pipeline Project -UKRAINE



*Onshore Gas Terminal Tankage- TURKMENISTAN
Weight | :2500 MT |
Total man-hour | :800.000 |
*MSCC unit Turkmenbashi Refinery - TURKMENISTAN
Piping | :1,900 MT |
Steel works | :3,800 MT |
Equipment | :3,550 MT |
E/I | :63 km |
Civil works | :13,000 m3 |
Man-hour | :1,600,000 |

.jpg)
*MDP-A Drilling Platform- TURKMENISTAN
Steel Works | :1200 MT |
Painting & Blasting | :12.000 m2 |
Total man-hour | :1.000.000 |
Height | :78 mt |

.jpg)
.jpg)
*MCR-A Topside & GBS - TURKMENISTAN
E/I works cabling | :165,000 mt |
Topside weight | :5,777 tons |
GBS weight | :8,030 tons |
Total weight of equipments | :875 tons |
Scaffolding erected | :24,000 m3 |
Painting and blasting | :36,000 m2 |
Piping installation | :51,000 dia-inch (800 tons) |
Insulation | :6,500 m2 |



*Lube-oil unit Turkmenbashi Refinery - TURKMENISTAN
Piping | :3,000 MT |
Steel works | :14,950 MT |
Equipment | :1,380 MT |
E/I | :30 km |
Civil works | :17,250 m3 |
Man-hour | :2,070,000 |
*Sugözü Coal Fired Thermal Power Plant 2x 605 MW - TURKEY
Piping | :3,500 MT |
Steel works | :26,500 MT |
Equipment | :8,800 MT |
E/I |
:585 km
|
Civil wokrs | :205,000 m3 |
Man-hour | :7,350,000 |



*Tynagh Combined Cycle Power Plant 400 MW - IRELAND
Piping | :1,500 MT |
Steel works | :2,500 MT |
Equipment | :3,800 MT |
E/I | :185 km |
Civil wokrs | :25,000 m3 |
Man-hour | :1,350,000 |
*HDT unit Turkmenbashi Refinery - TURKMENISTAN
Piping | :1,520 MT |
Steel works | :3,040 MT |
Equipment | :1,120 MT |
E/I | :195 km |
Civil works | :10,400 m3 |
Man-hour | :1,280,000 |
*Bukhara Refinery - UZBEKISTAN
Project Information
Piping | :2,750 MT |
Steel works | :3,040 MT |
Equipment | :2,800 MT |
E/I | :528 KM |
Civil works | :26,600 m3 |
Man-hour | :6,280,000 |
*CCR unit Turkmenbashi Refinery - TURKMENISTAN
Project information
Piping
:2,000 MT
Steel works
:4,000 MT
Equipment
:1,200 MT
E/I
:80 km
Civil works
:15,000 m3
Man-hour
:1,800,000
Azersu - AZERBAIJAN
Project information
*Kazakhstan/Pavlodar, Entire Operation of 2008-2009
Main Contractor : Unit Group
- Factory of gasification coal. (JSC, A.O.K)
- Rest House. Zarinsky District (JSC, A.O.K)
- Plant on production of primary aluminum. (Kazakhstan Electrolysis Plant)
- A Mechanical elevator with a capacity of up to 16.000 m3/h
- Rerouting of a 4.4 km stretch of the Zhezkazgan-Petropavlovsk, Route A-16
- Insallation of central desk, HVAC at SDPP-1 station, Ekibastuz
- Construction of an approach railroad to the electrolysis plant with a branch line to the Yuzhny Station.
- Railroad, CGS Dumping Machine No.3
- Loading of off-loading railway tracks at Vostochnaya Station.
*(Projects which founders of HICC have been involved.)
*Pavlodar, Rakhmet Mall
Main Contractor : Unit Group
Customer : Sharzen LLP
Project Duration : 12 Months (2008 - 2009)
- 4900 m2 total area.
*(Projects which founders of HICC have been involved.)
Pavlodar, Nursery School
Main Contractor : Unit Group
Customer : Kazakhstan Aluminum JSC
Project Duration : 12 Months ( November 2008 - December 2009)
- 240 people capacity,
*(Projects which founders of HICC have been involved.)
* Pavlodar, Four Blocks of Flats
Main Contractor : Unit Group
Customer : Kazakhstan Aluminum JSC
Project Duration : 18 Months ( February 2008 - September 2009)
*(Projects which founders of HICC have been involved.)
TPP 1, Pavlodar Cooling Tower (No.3)
Main Contractor : Unit Group
Customer : Kazakhstan Aluminum JSC
Project Duration : 19 Months ( February 2008 - September 2009)
*(Projects which founders of HICC have been involved.)
*Sakhalin LNG
Piping | :3,600 MT |
Steel works | :5,800 MT |
*Pavlodar CS Funnel (No 4), 120 Meters.
Main Contractor : Unit Group
Customer : Kazakhstan Aluminum JSC
Project Duration : 19 Months ( February 2008 - September 2009)
*(Projects which founders of HICC have been involved.)
Hadeed II Induction Plant Project – Kingdom of Saudi Arabia
General Project’s Data
1.240.000 ton/year capacity Direct Reduction Induction Plant mechanical works Installation, partial material supply and instrumentation works.
Customer Saudi Davy Company Ltd.
Scope of the Works
a. Mechanical Erection Works;
4.400 tons of structural steel fabrication and erection works
800 tons piping prefabrications and installation works (103.000 WDI)
8000 ton pressurized vessel fabrication and installation works
in addition to 440 tons of Reactor installations, heavy equipments installation works
20.000 m2 surface blasting and painting works
17.000 m2 roof and side wall cladding works
b. Instrumentation works;;
4.000 nos instruments
7000 m instrument cables
c. assistance to start up and commissioning activities.